TT.Mk1 Upper IC Hose Replacement with DV Relocation

From QuattroWorld Wiki

Jump to: navigation, search

Back to 2000-2005 (Mk1)

Submitted and Entered by: MCPaudiTT

SFS Upper IC Hose Installation, with Integrated DV Relocation T

Full documentation of the installation of the upper IC hoses. DV relocation is also documented, with the necessary accessories noted. In addition, a Boost Machine/N75 replumb is incorporated. Just click here

The process starts after the removal of the front bumper and passenger's side light. If you need instruction on doing that, click here, and follow through step 48, then start the process documented here.

Finished look:

File:QW.Wiki.MCPi.TT.Mk1.SFS1.jpg

Before:

File:QW.Wiki.MCPi.TT.Mk1.SFS2.jpg

Back to 2000-2005 (Mk1)